During the recent dry spell our client a large scale cattle feedlot were looking to sure up their water supply for their 18000 head capacity feedlot.
Identifying that when running stock water through channels without piggy backing with irrigation water created large losses in vital stock and domestic water. An alternative was needed.
Watertight worked along with the client and designed a submersible pump along with a 35km direct route pipeline which supplies many large Pioneer tanks which then gravitate through the feedlot.